Main stages of repair in the apartment or condo

From E-learn Portal
Jump to: navigation, search

The best ways to begin repair of the apartment?

The initial stage of the repair of old houses is the devastation and dismantling first off of the worn out walls and dividing walls, eliminating the wall surface as well as ceiling covering. This phase is among the most "filthy" stages of the fixing.

Another amongst one of the most important and "dusty" works is the home window block replacement. It is needed to do this first off since dirt as well as dirt will certainly be unallowable during adhering to stages as well as it is prohibited in all to open up home windows throughout paint and also wallpaper jobs (huge decreases of the temperature level as well as moisture are unallowable). After installing home windows and windowsills it is required to pack them right away in polyethylene movie and also to cover windowsills on top of that by the fiberboard (in order to prevent scrapes).



The following phase is electrical wiring. Circuitry could be mounted in wall surfaces or along the floor. Electrical wiring is made inside the pipes to make certain electric safety and security and also rise integrity. The pipe shields electrical wiring from exterior damages as well as enables to replace the wire completely without breaking wall surfaces and flooring simply by placing the new cord instead of the old one.

Residence Paint follows the wiring. The frequent blunder during the synchronised conducting of such works occurs when employees neglect to set out one of the cables as well as home painters have actually already smudged and also smoothed out the wall surface. Therefore, added works are necessary to secure goes after on the completed wall surface. The areas of the feed button and wall electrical outlet area and their number need to be thought-out in advance. The plan of power wiring is generally included into the design project.

In the future the system needs to prepare to solution in instance of failures. In addition to the wirings, the telephone cord and also the TELEVISION wire are laid out. The power cable should not be laid out near the telephone and also antenna wires to stay clear of sound pickup and also disturbance. One of the most peculiar moment is setting out the TV cable television. In order to make two (or three) TV sets in the home the 2nd cable television is frequently just "strongly soldered" in parallel, so the cable television resistance is reduced. Consequently, the display top quality is degraded, several programs can not be obtained as well as etc. In order to avoid such circumstance it is necessary to invite a specialist with special equipment. He will measure the signal degree of the each TV-feeder and also install TV-amplifiers or TV-filters.

Paint is the most long-term process, that is why it is performed concurrently in all premises, if it is feasible. Delays are related to the innovation. Each used layer of the plaster (or completing finishing) have to dry out completely before the job will proceed.

Works in hygienic arrangements as well as the cooking area begin at the same time with home paint. It is much better to fulfill supposed "unclean" works in the top place as well as concurrently. According to the plan of the hygienic technician location welding, wall surface chasing and pipeline run are performed. Heavy steam radiator admissions are prepared, faucets and brackets are installed, however radiators are not installed.

After that works in sanitary plans are carried out according to the strategy. The bath is mounted, after that walls are smoothed out as well as the floor tile is laid on wall surfaces. The list below stage is assembling ceiling as well as laying tiles on the floor. As well as at last other hygienic gadgets, mixers as well as devices are installed.

After electrical wiring, installation of rosette plates and also incurable boxes the voltage is signed in all point. Ends of wiring are shielded and also outlined into rosette plates. Sockets and also breakers are not set up throughout this stage in order to conserve their surface look. The coating puttying of walls is carried out simultaneously. The technically exact control of drying of the layer of the plaster (filling) is accomplished by drymeter. It is an unique instrument that determines wetness of the material.

The following stage is the procedure of fill. Fill up can be made with different products - from usual stonework cement-sand blend to self-aligning floors. The advantage of the easy mixture is its triviality, the disadvantage is that such blend is much harder aligned at the degree and also the last dry time of such fill is 40 days, only then the next phase of the collaborate with flooring could be carried out, i.e. the duration is also long. Self-leveling self-aligning floors are a lot more pricey, however a lot more technological. Straightening occurs virtually "instantly" i.e. fluid service of combination is put out, then it runs as well as you get the horizontal surface. The last dry time is 15 days i.e. you have significant time economic situation. commodes " is mounted into the fill. If the supposed "damp procedures" are inapplicable the modern technology of the dry lining up (the fill innovation) is utilized bases for floorings with flexible flooring battens are installed.

After fill door boxes and door are mounted. Setup of doors need to take into the account thickness of future flooring covering. After installation the door could be taken off its hinges as well as removed until completion of repair or loaded into polyethylene movie to shield from damages. At the same time ceiling can be painted and the tile could be stocked that premises where it was intended. The floor tile has to be laid on the absolutely dry overlay.

Finishing of the flooring mounting depends on the intended covering. In most cases (if finish covering is not the ceramic tile) fill is covered by asphalt mastic and plywood sheets are laid. They are fixed to the floor by self-tapping screws. One plywood sheet is fixed by 30-50 self-tapping screws to provide the close fixing of plywood and lasting solution of the flooring without squeak as well as bulging. The plywood offers the extra heat- and acoustic insulation. After placing of the plywood is finished, wallpaper for paint can be pasted on wall surfaces.

In premises where surface treatment of the flooring is laminated flooring or parquet stockpile, the normal wallpapers are pasted (except painting) to begin with. After that the flooring covering is placed.

If surface covering of the flooring is the block parquet, the parquet is laid in the starting point, then it is scratched and covered by one layer of lacquer. Then the regular wall-papers are pasted as well as the parquet is covered by the remainder layers of lacquer (depending on the top quality of the parquet as well as lacquer). The discussed repercussion is linked only with such scrambling procedure when the great quantity of dirt is produced. In spite of the fact that good floor grinders are outfitted with the vacuum cleaner, the enough amount of dust is precipitated on bordering subjects including walls. Dust is extremely acidic and is severely cleaned off. That is why in order not to harm wallpapers, they are pasted after clambering and also in order the parquet do not soak up the excess moisture it is covered by the one layer of lacquer prior to wallpaper pasting.

After this the main works could be considered to be ended up. It is left just to install the plinths, ornamental components, breakers and sockets, drape owners, to hang doors, plant-bands and others.

In conclusion it is essential to note that the series of jobs was noted in general and also can change relying on the precise circumstance - the variety of rooms in premise, your sources, peculiarities of the building and construction of the multilevel premises. It is based on sound judgment as well as every person with the ability of evaluation could separately produce such a series.